SMBH-2000 Unloader

The SMBH-2000 incorporates its own fully programmable touch panel offering complete control over pitch, spacing, top or bottom loading ensuring quick and easy placement and removal of loaded magazines.

leadtime icon Lead Time: 4 - 6 weeks
dollar icon $17,184.00
Learn more

SMBH-1000 Loader

The SMBH-1000 incorporates its own fully programmable touch panel offering complete control over pitch, spacing, top or bottom loading ensuring quick and easy placement and removal of loaded magazines.

leadtime icon Lead Time: 4 - 6 weeks
dollar icon $15,128.00
Learn more

AU-460 PCB Unloader

Strong, firm and stable design Panasonic PLC for programming, make sure machine running smooth, brand electrical parts like Omron box relay, FUJI press button etc grantee machine’s life.

leadtime icon Lead Time: 2 - 3 weeks
dollar icon $7,050.00
Learn more

UDS-M-HC Destacker

Works just like a loader but for bare board only.

leadtime icon Lead Time: 1 week
dollar icon $7,050.00
Learn more

ULD-S-NC Unloader

Top and bottom pneumatic clamps to secure magazine rack in right position, well designed pusher make sure no PCB damaged during loading and unloading.

leadtime icon Lead Time: 1 week
dollar icon $6,900.00
Learn more

AL-460 PCB Loader

SMC pneumatic parts from Japan make sure the precious action. Top and bottom pneumatic clamps to secure magazine rack in right position, well designed pusher make sure no PCB damaged during loading and unloading.

leadtime icon Lead Time: 2 - 3 weeks
dollar icon $6,450.00
Learn more

RIV-L-NC PCB Invertor

This equipment is used to turn over the PCB 180º degrees.

leadtime icon Lead Time: 1 week
dollar icon $5,500.00
Learn more

BLD-M-HC Bare Board Loader

Vacumming load pcb as loader.

leadtime icon Lead Time: 1 week
dollar icon $5,450.00
Learn more

LD-S-NC Loader

Top and bottom pneumatic clamps to secure magazine rack in right position, well designed pusher make sure no PCB damaged during loading and unloading.

leadtime icon Lead Time: 1 week
dollar icon $5,350.00
Learn more

MLS-020-L Manual Lift Gate Conveyor

Connecting between reflow oven to P&P, or P&P to P&P.

leadtime icon Lead Time: 1 week
dollar icon $5,100.00
Learn more

S150 Linkage/Inspection Conveyor

Connecting between reflow oven to P&P, or P&P to P&P, it's equipped with lighting features, single layer Part tray adjustable foot rest.

leadtime icon Lead Time: 1 - 2 weeks
dollar icon $1,400.00
Learn more

S100 Linkage/Inspection Conveyor

Connecting between reflow oven to P&P, or P&P to P&P, it's equipped with lighting features, single layer Part tray adjustable foot rest.

leadtime icon Lead Time: 1 - 2 weeks
dollar icon $1,350.00
Learn more

S50 Linkage/Inspection conveyor

Connecting between reflow oven to P&P, or P&P to P&P, it's equipped with lighting features, single layer Part tray adjustable foot rest.

leadtime icon Lead Time: 1 - 2 weeks
dollar icon $1,125.00
Learn more

IC-M-100-NC Conveyor

Connecting between reflow oven to P&P, or P&P to P&P.

leadtime icon Lead Time: 1 week
dollar icon $990.00
Learn more