The SMBH-2000 incorporates its own fully programmable touch panel offering complete control over pitch, spacing, top or bottom loading ensuring quick and easy placement and removal of loaded magazines.
Clock fast Lead Time: 4 - 6 weeks Money orange $17,184.00 $16,184.00
The SMBH-1000 incorporates its own fully programmable touch panel offering complete control over pitch, spacing, top or bottom loading ensuring quick and easy placement and removal of loaded magazines.
Clock fast Lead Time: 4 - 6 weeks Money orange $15,128.00 $14,128.00
The Combo Loader, loads your production line automatically, It is equipped with two PCB loading modes and especially suitable for single-line mode which processes double-sided PCBs.

Loader are available in bigger sizes for bigger PCB/panels.
Money orange $9,440.00
Strong, firm and stable design Panasonic PLC for programming, make sure machine running smooth, brand electrical parts like Omron box relay, FUJI press button etc grantee machine’s life.
Clock fast Lead Time: 2 - 3 weeks Money orange $7,050.00
Works just like a loader but for bare board only.
Clock fast Lead Time: 1 week Money orange $7,050.00
Top and bottom pneumatic clamps to secure magazine rack in right position, well designed pusher make sure no PCB damaged during loading and unloading.
Clock fast Lead Time: 1 week Money orange $6,900.00
The unit provides a 'normal open' passage in a PCB assembly line.
Clock fast Lead Time: 4 weeks Money orange $6,500.00 $6,150.00
SMC pneumatic parts from Japan make sure the precious action. Top and bottom pneumatic clamps to secure magazine rack in right position, well designed pusher make sure no PCB damaged during loading and unloading.
Clock fast Lead Time: 2 - 3 weeks Money orange $6,450.00
The unit provides a 'normal open' passage in a PCB assembly line.
Clock fast Lead Time: 4 weeks Money orange $5,600.00 $5,350.00
This equipment is used to turn over the PCB 180º degrees.
Clock fast Lead Time: 1 week Money orange $5,500.00
By manual lifting the conveyor section, access is gained to the rear of the line.
Money orange $5,400.00
Top and bottom pneumatic clamps to secure magazine rack in right position, well designed pusher make sure no PCB damaged during loading and unloading.
Clock fast Lead Time: 1 week Money orange $5,350.00
By manual lifting the conveyor section, access is gained to the rear of the line.
Clock fast Lead Time: 1 week Money orange $5,100.00
This unit is used to link between production machines or board handling units.
Clock fast Lead Time: 1 week Money orange $3,500.00
The inspection conveyor is used when frequent visual inspection of PCB’s is required in the PCB assembly line.
Clock fast Lead Time: 1 - 2 weeks Money orange $3,500.00
The inspection conveyor is used when frequent visual inspection of PCB’s is required in the PCB assembly line.
Clock fast Lead Time: 1 - 2 weeks Money orange $3,500.00
This unit is used to link between production machines or board handling units.
Clock fast Lead Time: 1 - 2 weeks Money orange $3,200.00
×